Sink & Hob Cutouts

Where an Apollo® Slab Tech splash back or wall cladding is installed a gap of 50mm (minimum) is required behind an electric hob or 150mm (minimum) for a gas hob. A ‘breakfront’ may be necessary to accommodate this requirement. There must be a minimum of 50mm from the cutout to the front of the worktop and a gap of 120mm between cutouts.

A minimum of 50mm is required between two sink cutouts. Sink cutouts must be placed a minimum of 80mm from the worktop front edge.

Interested in this product? Get a quote

Cutouts

Belfast Cutout Belfast (inc. drip groove)
Cutouts Hob/Sink Cutout
Cutouts Polished Cutout

Notes:

  • A minimum of 120mm is required between two hob cut-outs.
  • A minimum of 80mm is required between hob and sink cut-outs.
  • A minimum of 50mm is required between two sink cutouts.
  • Sink cut-outs are placed 80 – 90mm from the worktop front edge.